2022 Sportsman 352

"Change Order"

$269,000USD
$381,491 CAD
West Palm Beach , Florida, United States
35'length
2022year
1heads
PowerUsedFiberglassGas/Petrol

2022 Sportsman 352 Center Console "Change Order"—twin Yamaha 425s with low hours and extended warranty. Loaded with dual Garmin 22" displays, JL Audio, dual livewells, and a console berth sleeping 3. SportTech vacuum-infusion hull with 10-year warranty. Turnkey and ready for anything.

Overview

This 2022 Sportsman 352, "Change Order," is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425 outboards with digital electric steering and low hours under 300, backed by an extended engine warranty. Built for serious performance and all-day comfort, she blends innovative technology, high-end finishes, and genuine fishability.

At the helm, dual Garmin GPSMAP 8622 22" displays, a Yamaha Command Link Plus CL7 touchscreen, and SeaStar Maximus digital switching pair with an Edson stainless steel steering wheel and a JL Audio M6 sound system with 12 speakers. Anglers will appreciate dual 30-gallon pressurized aquarium livewells, macerated in-deck fish boxes, six flush-mounted gunwale rod holders, and a high-speed livewell pickup and sea chest.

Comfort runs just as deep, with triple premium captain's chairs, a rear-facing seat with sink, an electric-actuated bow table and sun deck, and a console berth with sleeping for two adults plus a child, complete with sink, shower, and porcelain head. Built on SportTech vacuum-infusion hull construction backed by a 10-year hull warranty, this 35-foot center console is turnkey and ready for anything — whether you're heading offshore or entertaining at the sandbar.


Sea Lake Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

Dimensions

Length Overall35' 2"
Beam11' 2"
Draft2' "

Details

Year2022
ManufacturerSportsman
Model352
CategoryCenter Consoles, Saltwater Fishing
TypePower
Hull MaterialFiberglass

Accommodation

Heads1

Performance

Fuel TypeGas/Petrol
Cruise Speed37.8 MPH

Weight

Dry Weight9,850 lbs

Tank Capacities

Fuel330 gal
Fresh Water35 gal

Registration

HIN/IMOVHB37511L920

Engines

Engine 1Yamaha XF425NSA2
2022Year
OutboardType
425HP
317KW
250Hours
Engine 2Yamaha XF425NSA2
2022Year
OutboardType
425HP
317KW
250Hours

Videos

Full Details

Helm & Electronics

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13" stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort & Layout

  • Triple premium captain's chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility

  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400' line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty

Donation Program Notice

This vessel is part of a donation program — ownership transfer may differ from a standard title transfer. Please contact us with any questions before your showing.

Disclaimer

DH Yacht Sales presents the information contained in this listing in good faith and from sources believed to be reliable; however, the Company makes no warranty or guarantee, express or implied, as to the accuracy of this information or the condition of the vessel. Prospective buyers are strongly advised to engage their own agents and/or marine surveyors to independently verify all details material to their purchase decision.

This vessel is offered subject to prior sale, price change, or withdrawal without notice. Engine and generator hours are provided as reported and cannot be guaranteed; actual hours may vary from what is listed.

A closing fee of a minimum of $495.00 will be added to the vessel's final purchase price. Please contact your selling agent for a complete closing statement, as fees may vary by transaction. Coast Guard documentation, state registration, sales tax, and any other applicable fees are not included in the listed price.

Mechanical Disclaimer

Engine and generator hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.

Listing MLS by Yachtr.com

Contact Us

Interested in this Sportsman?

Send us a message and our expert brokers will get back to you within 24 hours

Inquiring About2022 Sportsman 352"Change Order"$269,000
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Doug Hughes
Your Listing Broker

Doug Hughes

Owner / BrokerSea Lake Yachts LLC

Sea Lake Yachts

Location
1500 Marina Bay Drive
Bldg. 112
Kemah, TX, 77565

Prefer to Talk?

Call us directly to speak with an expert broker about this vessel.

Call 1-281-549-4724